| AKEESHA JEFFERSON |
|---|
TEMPORARY ADDRESS 1221 Clearwater Road, Apt. 16 St. Cloud, MN 56301 Phone (320) 555-2324 | PERMANENT ADDRESS R. R. #4, Box 126 Fairport, MN 57634 Phone (320) 555-2494 | - PROFESSIONAL OBJECTIVE
- Design, development, and promotion of steam supply systems for heating and cooling, focusing on thermal-hydraulics and heat transfer in power plant design and operation
- PROFESSIONAL EXPERIENCE
- Bechtel Power Corporation
Gaithersburg, MD; May 1998-September 1998 Summer Intern with Nuclear Staff Thermal-hydraulics Group- Calculated Three Mile Island reactor drain down and dry steady-state simulations, which were part of the successful effort to lift the Unit 2 reactor pressure vessel head
- Completed Farley Reactor Cavity Analysis that produced force and moment histories for the revision of the Farley Final Safety Analysis Report
- Northern States Power
Monticello, MN; May 1997-August 1997 Summer Intern with Nuclear Staff Thermal-hydraulics Group- Assisted senior engineers with calculations of simulated main steamline breaks, subcompartment and containment analysis
- Assisted with hydrogen generation calculations for equipment qualifications and igniter box performance
- Prepared a post data processor for a subcompartment analysis computer code
- Fabricated a summary chart of containment and subcompartment analysis results of the Thermal-hydraulics Group
- ACADEMIC BACKGROUND
- St. Cloud State University; St. Cloud, MN
Bachelor of Science in Electrical Engineering, May 1999 - COLLEGE ACTIVITIES
- National Society of Black Engineers
- St. Cloud State Camera Club
- Freelance Photographer
- Student Coalition Against Racism
|
|